Rubber Cracker Mill Rubber Tire Crusher

Rubber Cracker Mill   Rubber Tire Crusher

Rubber Cracker Mill sol Rubber Crusher EPT

Information of waste tyre recycling EPT colon
The internal cavity of the roll is processed to make temperature effectively poportioned on the roll area interval And make cooling h2o biking treatment method comma for this merchandise we have applied patent in CHINA period of time
B comma We use the Hardened EPT period

XKP-400 sol450 sol560 type waste tire rubber powEPTproduction EPT
Process flows colon Waste tires— circle slicing— strip reducing— block reducing— magnetic separating—rubber powder period of time
Rubber powEPTprocessing equipments colon The EPT established of rubber powEPTmaking equipments are consist of a few principal parts colon Scrap tires separating equipments comma crusher set and grading magnetic separator interval

EPT line demonstrating colon
The listing of EPTs colon
No Name product quantity EPT
EPT tire pre-processing comma you will get lt fifty ast50MMrubber crumb
1 Ring cutter QQJ-1200 1 5 period5KW
2 Loop EPT YQJ-295 one 15KW
three Strip cutter QTJ-370 one five period5 KW interval
4 Block cutter QKJ-200 one eleven KW
Rubber powEPTprocessing colon You will get 20-thirty mesh rubber powder comma at the same time comma
Different the fiber and steel wire
five Tyre crusher XK560 1 seventy five KW
6 Large conveyor equipment BCL-eight one two KW interval
7 Little conveyor equipment BCL-three 1 1 period1 KW
eight Big Magnet separator BMS22 one two period2 KW
nine Little Magnet separator SMS-1 1 1 period1 KW
10 Huge Shaking screen BSS-8 one seven period5 KW
eleven Little Shaking display SSS-3 1 three KW

Guaranetee amp soon after revenue service colon
1 period of time A single calendar year promise for EPT EPT
2 period24hours specialized assistance by electronic mail or other tools
three period Contacting or door -to -doorway service
4 period of time Use friendly english application consumer manual and comprehensive videos period of time

If you are fascinated in our EPTs comma or have any qusstions comma get in touch with us freely~

Primary framework and characteristic
This is a double roll rubber-miXiHu (West Lake) Dis.ng EPT time period It consists of motor comma gear-down EPT comma driving gears comma pace-ratio gears comma entrance and back rolls comma bearings comma frame comma include comma mattress plate comma adjusting pin gadget comma emergency quit gadget comma roll temperature changing unit comma lubricating device and content plate comma and so forth period
Front and back again rolls are pXiHu (West Lake) Dis.Hu (West Lake) Dis.lel mounted in the bearing of frame period By means of EPT comma driving gears comma velocity ratio gears comma the motor drives the front and back again rolls rotate toward every single other so that rubber-cracking is begun period of time The rolls are created from chilled cast alloy iron semi The interior of it is hollow time period Steam and cooling drinking water can pass by means of them so that the area temperature can be modified time period Its surface area possesses increased hardness and fineness time period

XKP-400 XKP-450 XKP-560
Working diameter of front roller lparmm rpar Phi400 Phi450 Phi560
Functioning diameter of rear roller lparmm rpar Phi400 Phi450 Phi510
Working duration of rollers lparmm rpar 600 760 800
Serface velocity of front roller lparm solmin rpar twenty 23 period2 25 period56
Velocity ratio of rollers 1 colon1 period38 1 colon1 period38 one colon1 period3
MaXiHu (West Lake) Dis.mum hole amongst rollers lparmm rpar eight 8 eight
Capacity lparkg solh rpar three hundred 400 500
EPT lparkw rpar 45 fifty five 75
Dimension lparmm rpar 3950 ast1800 ast1780 4770 ast1845 ast1835 5064 ast2284 ast1978
Excess weight lparkg rpar 7000 12000 19000

Rubber Cracker Mill   Rubber Tire Crusher

Rubber Cracker Mill   Rubber Tire Crusher

Tags

Location